top of page

2017 Articles and Press Releases

August 10, 2017
Alamenda Corridor East Grade Separation Trench Opens (PDF File - 130KB)
​
July 24, 2017 
Trains Won't Break Silence of San Gabriel Mission: New Trench Ends 143 Years of Noise (PDF File -356KB) 
​
July 24, 2017
San Gabriel Trench Welcomes Inaugural Train Service (PDF File - 197KB) 
​
July 24, 2017 
San Gabriel Trench Opens to Train Traffic (PDF File - 212KB) 
​
July 24, 2017 
Trains Start Rolling on $313 Million San Gabriel Railroad Trench (PDF File - 340KB) 
​
July 24, 2017
New San Gabriel Trench May Help Preserve Historic Mission (PDF File - 218KB) 
​
July 24, 2017
Mile-long Train Trench Opening Celebration in San Gabriel Valley (PDF File - 322KB) 
​
July 24, 2017 
Trench Quiets Noisy San Gabriel Train Route (PDF File - 150KB) 
​
July 24, 2017 
First Freight Train Passes through New Trench Next to San Gabriel Mission (PDF File - 95KB) 
​
July 24, 2017 
30-Foot-Deep, 65-Foot-Wide Train Trench Quiets Rails Near San Gabriel Mission (PDF File - 97KB) 
​
July 24, 2017
Officials Inaugurate Train Service in San Gabriel Railroad Trench (PDF File - 243KB) 
​
June 19, 2017 
Business Life: Nogales St. Roadway Underpass Tapped as the Top Safety Project at Transportation Awards Event (PDF File) 
​
May 24, 2017 
Nogales Street Roadway Underpass Tapped as the Top Safety Project at Transportation Awards Event (PDF File) 
​
May 16, 2017 
ACE Leadership Joins in National Push on Capitol Hill for Federal Infrastructure Funding (PDF File - 262KB) 
​
April 19, 2017 
Pico Rivera Magazine: Durfee Avenue Grade Separation Project (PDF File - 457KB) 
​
January 24, 2017 
Juli Costanzo & Victoria Martinez Elected ACE Chair and Vice Chair (PDF File - 253KB) 

For construction project information, please call the Project Helpline at (888) ACE-1426.

San Gabriel Valley Council of Governments

(626) 962-9292 | ​1333 S. Mayflower Avenue, Suite 360, Monrovia, CA 91016

For financial documents, staff contact, salary information, and employment opportunities, please visit the San Gabriel Valley Council of Governments website at sgvcog.org.
​

The San Gabriel Valley Council of Governments (SGVCOG) is committed to compliance with the Americans with Disabilities Act ("ADA") and to provide access to SGVCOG’s website for all individuals, including those with disabilities. The SGVCOG continually reviews and provides updates to its website to ensure adherence to best practices in web accessibility to the extent practicable. If you need assistance with accessing something on this website, please contact the SGVCOG at (626) 962-9292 or sgv@sgvcog.org. Reasonable accommodations, including equal access to SGVCOG communications, will also be provided upon request. Requests for reasonable accommodations should be directed to the SGVCOG at (626) 962-9292, between the hours of 8:00 am – 5:00 pm, Monday through Friday.

​

To view our Privacy Policy, please visit here

  • facebook
  • twitter
  • linkedin

©2025 ACE Project. All rights reserved. Please click here to see our Legal Disclaimer before using this website.
Adobe Acrobat Reader is required to view, download and print PDF format documents on our website. 
To obtain the latest version of the free Adobe Acrobat Reader, please click here
This website is best viewed with the latest web browser version of Internet Explorer, Safari, Firefox and Google Chrome.

Project Description

The project will focus on enhancing transportation infrastructure and safety at two Union Pacific Railroad (UPRR) at grade crossings located at Hamilton Boulevard and Park Avenue in the City of Pomona. Key elements of this project include: 

  • Roadway modifications: Implementing a road diet and install Class 2 buffered bike lanes to close a critical bicycle network gap along Hamilton Boulevard (from Orange Grove to Mission) and Park Avenue (from W. Commercial to 3rd St.)​

  • Railroad Safety Upgrades: Install pedestrian swing gates, pedestrian alert systems, right-of-way fencing and railroad crossing signage to improve safety for both pedestrian and cyclist. 

  • Pedestrian Enhancements: Construct new and enhanced widened sidewalks and add crosswalks and one pedestrian refuge island to improve safety and accessibility. 

  • ADA Accessibility: Install curb ramps compliant with the American with Disabilities Act (ADA) at key crossing points. â€‹

​

Project Status

ACE selected a firm in February 2015 to design the proposed at-grade crossing safety improvements. The project is currently at 95% design complete. The design is estimated to be completed in Spring 2025. Total project cost is estimated at $10 million.

​

Project Benefits

The project will significantly improve the safety and connectivity in the city. The upgrades will close a critical north-south bicycle network gap and enhance connectivity between downtown Pomona's Key Destinations such as Western University, the Pomona Arts District and County Services such as low income housing, elementary schools, community centers and the Pomona Transit Center. The improvements will ultimately enhance mobility and the quality of life for the residents of Pomona and visitors. 

bottom of page